Introduction to pasting method of glass fiber mesh cloth

Source:sdgbl.cn      Release date: 2023-01-06
Glass fiber gridding cloth is made of glass fiber woven fabric as the base material and coated with high molecular anti lotion. Therefore, it has good alkali resistance, flexibility and high tensile resistance in longitude and latitude, and can be widely used for thermal insulation, waterproof and crack resistance of internal and external walls of buildings.
Glass fiber gridding cloth is made of glass fiber woven fabric as the base material and coated with high molecular anti lotion. Therefore, it has good alkali resistance, flexibility and high tensile resistance in longitude and latitude, and can be widely used for thermal insulation, waterproof and crack resistance of internal and external walls of buildings. Glass fiber gridding cloth is mainly alkali resistant glass fiber gridding cloth. It is made of medium alkali free glass fiber yarn (mainly composed of silicate, with good chemical stability), twisted and woven by special organizational structure - leno weave, and then treated by high temperature heat setting treatment such as alkali resistant and reinforcing agent.
Glass fiber gridding cloth is mainly used in wall reinforcement materials (such as glass fiber wall gridding cloth, GRC wallboard, EPS interior and exterior wall insulation board, gypsum board, waterproof roll cloth, asphalt roof waterproof, fireproof board, building caulking tape, etc.).

Paste method of glass fiber mesh cloth:

1. The preparation of polymer mortar must be in the charge of a specially assigned person to ensure the mixing quality.
2. Open the barrel cover anticlockwise, and use the agitator or other tools to re stir the adhesive, so as to avoid the separation of the adhesive. Mix it moderately, so as to avoid quality problems.
3. Mix ratio of polymer mortar: KL binder: 425 # sulphoaluminate cement: sand (with 18 mesh sieve bottom):=1:1.88:3.25 (weight ratio).
4. The cement and sand shall be poured into the iron ash tank for mixing after being weighed in the dosage bucket. After the mixing is even, the binder shall be added according to the mix proportion for mixing. The mixing must be even to avoid segregation and congee. Water can be added properly according to workability.
5. Water is used for concrete.
6. Polymer mortar shall be prepared whenever used, and the prepared polymer mortar shall be used up within 1 hour. Polymer mortar shall be placed in a cool place to avoid sun exposure.
7. Cut the mesh from the whole roll of glass fiber mesh according to the length and width required in advance, and reserve the necessary overlapping length or overlapping length.
8. Cut it in a clean and flat place. The blanking must be accurate. The cut mesh must be rolled up. It is not allowed to fold or step on it.
9. A strengthening layer shall be made at the external corner of the building, and the strengthening layer shall be pasted on the inner side, 150mm on each side.
10. When applying polymer mortar for the first time, keep the EPS board dry and remove harmful substances or impurities from the board cotton.
11. A layer of polymer mortar shall be scraped on the surface of the polystyrene board. The scraped area shall be slightly larger than the length or width of the mesh, and the thickness shall be about 2mm. Except for the requirements for edge wrapping, polymer mortar is not allowed to be painted on the side of the polystyrene board.
12. After the polymer mortar is scraped, the mesh shall be arranged on it. The curved surface of the mesh shall face the wall, and the mesh shall be plastered from the center to the periphery. The mesh shall be embedded in the polymer mortar. The mesh shall not be folded. After the surface is dry, a layer of polymer mortar shall be plastered on it, with a thickness of 1.0mm, and the mesh shall not be exposed.
13. The lapping length around the mesh shall not be less than 70mm. At the cut part, the patched mesh shall be used for lapping, and the lapping length shall not be less than 70mm.
14. A reinforcing layer shall be made around the door and window arm, and the reinforcing layer grid cloth shall be pasted on the inner side. If the distance between the outer skin of the door and window frame and the surface of the base wall is more than 50mm, the grid cloth shall be pasted with the base wall. If it is less than 50mm, it needs to be turned over. The grid cloth laid on the large wall shall be embedded in the outside of the door window frame and stuck firmly.
15. At the four corners of the door and window, after the standard mesh is plastered, another 200mm shall be added at the four corners of the door and window × 300mm standard mesh, placed at a 90 degree angle with the bisector of the window corner, pasted on the outermost side for reinforcement; A 200mm long mesh suitable for the width of the window arm shall be added at the internal corner and pasted on the outermost side.
16. Under the windowsill on the first floor, in order to prevent damage caused by impact, the reinforced mesh shall be placed first, and then the standard mesh. The reinforcing grid cloth shall be butted.
17. The construction method of placement reinforcement layer is the same as that of standard mesh.
18. The grid cloth pasted on the wall shall be covered on the grid cloth of the turnover package.
19. The mesh shall be plastered from top to bottom. For synchronous construction, the reinforced mesh shall be plastered first, and then the standard mesh shall be made.
20. After the mesh is glued, it shall be protected from rain wash or impact. For external corners that are easy to collide, doors and windows shall be protected, and anti pollution measures shall be taken at the feeding port. In case of surface damage or pollution, it must be handled immediately.
21. The protective layer shall not be exposed to rain within 4 hours after construction.
22. After the final setting of the protective layer, it shall be cured by spraying water in time. When the average temperature in the day and night is higher than 15 ℃, it shall not be less than 48 hours, and when it is lower than 15 ℃, it shall not be less than 72 hours.
性一交一乱一乱一视频| 亚洲精品乱码久久久久久蜜桃| 好了av四色综合无码| 香蕉成人伊视频在线观看| 人人玩人人添人人澡| 人妻丰满熟妇岳av无码区hd| 国产69精品久久久久9999apgf| 日韩av片无码一区二区不卡电影| 免费毛片全部不收费的| 日本爽快片100色毛片| 久久久久99精品成人片三人毛片 | 久久婷婷五月综合97色直播| 无套内谢孕妇毛片免费看看| 国产av一区最新精品| 看全色黄大色黄大片 视频| 日韩av东京社区男人的天堂| 国产精品岛国久久久久| 88久久精品无码一区二区毛片| 无码av一区二区三区无码| 国产日产欧洲无码视频| 亚洲暴爽av人人爽日日碰| 亚洲一区二区三区丝袜| 日本三级欧美三级人妇视频黑白配 | 国产熟女一区二区三区五月婷| 18禁在线永久免费观看| 国产欧美日韩精品专区 | 色 亚洲 日韩 国产 综合| 国内揄拍国内精品人妻浪潮av| 国自产拍偷拍精品啪啪一区二区 | 国产精品二区一区二区aⅴ污介绍| 亚洲av中文无码乱人伦| 日韩人妻无码精品无码中文字幕| 夜夜爽一区二区三区精品| 久久精品无码中文字幕| 欧美黑人性暴力猛交喷水| 色婷婷综合久久久久中文| 久久精品国产亚洲av麻豆色欲| 业余 自由 性别 成熟视频 视频| 白嫩日本少妇做爰| 欧美牲交a欧美牲交aⅴ久久| 小妖精又紧又湿高潮h视频69 |